91性高湖久久久久久久久久,久久亚洲综合精品人妻,五月停停色综合,日韩无码高清视频

Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > Ili Jinzhi Coking Co., Ltd. Coal Preparation Plant
40伊犁金志焦化有限公司選煤廠.jpg
  • 40伊犁金志焦化有限公司選煤廠.jpg

Ili Jinzhi Coking Co., Ltd. Coal Preparation Plant

Type: Coking coal preparation plant

Scale: Phase I 0.75Mt/a, Phase II 1.20Mt/a

Contracting mode: EPC general contracting, new construction projects

Process: 70-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. Coarse coal slurry is sorted by the coal slurry heavy medium cyclone, fine coal slurry is sorted by a flotation machine, and flotation clean coal is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The flotation tail coal is collected using a two-stage concentration process. After the tail coal slurry water is concentrated in the thickener, it is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The washing water is closed loop, environmentally friendly and energy-saving.